{"id":974,"date":"1991-01-01T23:19:36","date_gmt":"1991-01-01T23:19:36","guid":{"rendered":"https:\/\/mig-ysa.com.mx\/?p=974"},"modified":"2021-06-17T16:21:43","modified_gmt":"2021-06-17T16:21:43","slug":"cementos-mexicanos-s-a-de-c-v-huichapan-hgo-mexico","status":"publish","type":"post","link":"https:\/\/mig-ysa.com.mx\/en\/1991\/01\/01\/cementos-mexicanos-sa-de-cv-huichapan-hgo-mexico\/","title":{"rendered":"Cementos Mexicanos SA de CV Huichapan, Hgo., Mexico"},"content":{"rendered":"
\n\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

1991 – 1993<\/span><\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t\t\t

CEMENTOS MEXICANOS SA DE CV HUICHAPAN, HGO., MEXICO<\/span><\/h1>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t
  • Metallic Structures: 950 tons of supply, manufacture and assembly for the clay and shale warehouse roof; galleries for the transport of cement at a height of 45 m; galleries for the transport of raw materials; galleries for the transport of raw flour.<\/li>
  • Sheet: 2,768 m2<\/sup>\u00a0.<\/li>
  • Paint: Finish and primer 1,073 tons Includes sandblasting.<\/li>
  • Handrails: 645 m.<\/li>
  • Mechanical Assembly: 1,010 tons of Mechanical Equipment consisting of belt conveyors, pulleys, reducers, motors, primary crusher, secondary crusher, motion detectors, metal separator.<\/li>
  • Pipelines and chutes: 123 tons.<\/li>
  • Pipes: 690 m from 1 \u201dto 12\u201d in diameter.<\/li>
  • Disassembly and Assembly: 35 tons of metal structure for the roof of the project's materials warehouse.<\/li>
  • Electrical Work: Lighting and land system in the project warehouse.<\/li><\/ul>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
    \n\t\t\t\t\t\t
    \n\t\t\t\t\t
    \n\t\t\t
    \n\t\t\t\t\t\t\t\t
    \n\t\t\t\t
    \n\t\t\t\n\t\t\t