{"id":968,"date":"1993-01-01T23:17:37","date_gmt":"1993-01-01T23:17:37","guid":{"rendered":"https:\/\/mig-ysa.com.mx\/?p=968"},"modified":"2021-06-17T16:21:14","modified_gmt":"2021-06-17T16:21:14","slug":"cementos-tolteca-s-a-de-c-v-tepeaca-puebla-mexico","status":"publish","type":"post","link":"https:\/\/mig-ysa.com.mx\/en\/1993\/01\/01\/cementos-tolteca-sa-de-cv-tepeaca-puebla-mexico\/","title":{"rendered":"Cementos Tolteca SA de CV Tepeaca, Puebla, Mexico"},"content":{"rendered":"
\n\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

1993 – 1996<\/span><\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t\t\t

CEMENTOS TOLTECA SA DE CV TEPEACA, PUEBLA, MEXICO<\/span><\/h1>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Project: Construction of Furnace Plant No. 1<\/p>

  • Metallic Structures: Supply, manufacture and assembly of 1,382 tons for the triodetic cover of the Palletizing Building; for the support structure racks of services; for galleries to support clinker conveyors and warehouse (bunker); for the support galleries of the cement transport; support structure for refractory brick in clinker cooler; fine hopper support; triodetic cover of the tiling area.<\/li>
  • Mechanical Assembly: 870 tons of mechanical equipment assembly for cement belt conveyors; primary and secondary crusher, screens, metal detectors, belts, motors; traveling cranes, 950 m long roller conveyor belt.<\/li>
  • Ensa grid: 722 m2<\/sup>.<\/li>
  • Mesh steps: 385 pieces.<\/li>
  • Handrails: 1,024 m.<\/li>
  • Sheet: 2,430 m2<\/sup>\u00a0for roofs and facades of buildings and galleries.<\/li>
  • Civil Works: 3,120 m2<\/sup>\u00a0Crushing Product Material to complement the embankment by erosion and runoff for the FFCC tracks includes hauling, laying, leveling and banding with a bulldozer<\/li>
  • Service: Provision of personnel for technical support of testing and commissioning of mechanical equipment for the areas of cement mills, additives park, clay park, crushing, cement warehouse and dry pozzolan silo.<\/li><\/ul>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
    \n\t\t\t\t\t\t
    \n\t\t\t\t\t
    \n\t\t\t
    \n\t\t\t\t\t\t\t\t
    \n\t\t\t\t
    \n\t\t\t\n\t\t\t