{"id":937,"date":"1996-01-01T23:05:44","date_gmt":"1996-01-01T23:05:44","guid":{"rendered":"https:\/\/mig-ysa.com.mx\/?p=937"},"modified":"2021-06-18T15:47:41","modified_gmt":"2021-06-18T15:47:41","slug":"cemento-panama-s-a","status":"publish","type":"post","link":"https:\/\/mig-ysa.com.mx\/en\/1996\/01\/01\/cement-panama-sa\/","title":{"rendered":"Cemento Panam\u00e1 SA"},"content":{"rendered":"
\n\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

1996 – 1997<\/span><\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t\t\t

CEMENTO PANAMA SA<\/h1>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Project: Construction of final mill No. 5, Quebrancha Plant, Col\u00f3n.<\/p>

  • Civil Works: Reinforced concrete silo built with 66 m high and 24 m diameter sliding formwork; 20 mx 20 mx 32 m high concrete structure mill building; 2 transfer towers of reinforced concrete structure of 7 mx 8 mx 12 m high and two levels; 5 mx 5.50 m and 30 m reinforced concrete reclaim tunnel; 8 concrete columns and 7 beams to support conveyors built with sliding formwork and post-tensioned beams weighing 38 tons each.<\/li>
  • Concrete: 3,860 m3<\/sup>; reinforcing steel: 782 tons.<\/li>
  • Mechanical Work: Mechanical assembly: 610 tons of mechanical equipment consisting of a ball mill; helical conveyors; belt conveyors; motors, dust collectors; dispensers; valves; bucket elevators; bombs.<\/li>
  • Supply, manufacture and assembly of 192 tons of metallic structure and 85 tons of hoppers, ducts and chutes; 2,280 m of pipes from 1.5 \u201dto 8\u201d in diameter.<\/li>
  • Electrical Work: Supply and electrical installation consisting of Lighting Systems; Force; Control; Digital and Analog Instrumentation; Power; Lands and Lightning Struts; Installation, connection and testing of the 2,500 KVA, 13,200 \/ 4,160 V substation.<\/li><\/ul>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t