{"id":931,"date":"1997-01-01T23:03:45","date_gmt":"1997-01-01T23:03:45","guid":{"rendered":"https:\/\/mig-ysa.com.mx\/?p=931"},"modified":"2021-06-17T16:18:33","modified_gmt":"2021-06-17T16:18:33","slug":"cementos-diamante-de-ibague-s-a","status":"publish","type":"post","link":"https:\/\/mig-ysa.com.mx\/en\/1997\/01\/01\/diamond-cements-from-ibague-sa\/","title":{"rendered":"Cementos Diamante de Ibague SA"},"content":{"rendered":"
\n\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

1997 – 1999<\/span><\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t\t\t

CEMENTOS DIAMANTE DE IBAGUE SA<\/h1>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Project: Kiln No. 2<\/p>

  • 1,280 tons of supply, manufacture and assembly of metallic structures for the clinker transport galleries; transport of additives; galleries for cement transport; structures for service racks; primary and secondary crushing building; supports for gas ducts; geodesic cover or schwedler dome; support structures for electro filters.<\/li>
  • 340 tons of supply, manufacture and assembly of pipelines and chutes for various mechanical equipment.<\/li>
  • 502 tons of assembly of mechanical equipment for feeding, grinding, transportation and storage of cement; Roller press; cement silo aeration system; bucket elevators; dust collectors; helical conveyors; valves; sliders; fans; reducers; engines; conveyor belts.<\/li>
  • 2,280 m of pipes from 1 \u201dto 10\u201d in diameter.<\/li>
  • 910 m2<\/sup>\u00a0 grid type ensa for platforms and stair landings.<\/li>
  • 794 m of handrails for platforms and stairs.<\/li>
  • 12,690 m2<\/sup> sheet for the Schwedler dome roof, galleries and facades.<\/li><\/ul>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
    \n\t\t\t\t\t\t
    \n\t\t\t\t\t
    \n\t\t\t
    \n\t\t\t\t\t\t\t\t
    \n\t\t\t\t
    \n\t\t\t\n\t\t\t