{"id":901,"date":"2007-01-01T22:17:52","date_gmt":"2007-01-01T22:17:52","guid":{"rendered":"https:\/\/mig-ysa.com.mx\/?p=901"},"modified":"2021-06-17T16:16:53","modified_gmt":"2021-06-17T16:16:53","slug":"cemex-planta-tepeaca-tepeaca-puebla-mexico","status":"publish","type":"post","link":"https:\/\/mig-ysa.com.mx\/en\/2007\/01\/01\/cemex-plant-tepeaca-tepeaca-puebla-mexico\/","title":{"rendered":"CEMEX Tepeaca Plant, Horno 2, Puebla, Mexico"},"content":{"rendered":"
\n\t\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

2007 – 2008<\/span><\/p>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t

\n\t\t\t\t
\n\t\t\t\t\t\t\t

CEMEX TEPEACA PLANT,\u00a0PUEBLA, MEXICO<\/span><\/h1>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t
  • 1,718 tons of supply, manufacture and assembly of metallic structures in the following areas: preheater building; galleries for the transport of clinker, up to 135 m high.<\/li>
  • 2,301 tons of mechanical equipment assembly: preheater building; homogenization silos; crushing, transportation and storage of additives; cement mill no. 4; feed to the preheater.<\/li>
  • 1,131 tons of supply, manufacture and assembly of pipelines in: cooler and main collector; raw material mills.<\/li>
  • 372,000 m3<\/sup> excavation and embankments of stone materials, loading, hauling, homogenizing, laying and compacting to form a platform for railroad tracks, interior roads and buildings.<\/li>
  • 6,436 m of railings on platforms, galleries, bridges.<\/li>
  • 252 tons of supply, qualification and placement of anti-skid plate.<\/li>
  • 6.724 m2<\/sup>\u00a0sheet for roofs and facades.<\/li>
  • 2,208 tons of metal structure assembly in the preheater building.<\/li>
  • 4,015 m2<\/sup>\u00a0grid type ensa for platforms and stair landings.<\/li>
  • 3,508 tons of supply and application of paint and sand blast for structures, ducts, chutes and railings.<\/li><\/ul>\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t
    \n\t\t\t\t\t\t
    \n\t\t\t\t\t
    \n\t\t\t
    \n\t\t\t\t\t\t\t\t
    \n\t\t\t\t
    \n\t\t\t\n\t\t\t